The
following projects were completed during the summer and fall of
2003:
A,
B, D, E and G Buildings
A-E and G Buildings - Classroom upgrades: paint walls, ceilings
and doors. A,
H and P Buildings to receive bathroom upgrades.
A-G Buildings - Lighting occupancy sensors
Building R / Gymnasium - Replace lighting
Building O - Re-roof and upgrade HVAC
A, B, D, E and G Buildings DDC - HVAC controls upgrade
Reroof Buildings
O & P
Upgrade electrical panel & transformer, Building P
Replace All Existing Building Water Valves
Replace Heat Pumps, Buildings O & P
A/C for classrooms, Buildings O & P
Repair and Sealcoat Asphalt Walkways
Waterproofing Repairs to Rear Walls Bldg A - G
Replace A/C Condensate Pans at LRC
Energy
Reduction Projects
Completed in
2003 - 2004
Motion Sensors for Classroom Bldgs A,B,D,E, G to Reduce
Electrical Usage in Unoccupied Spaces
Precision Air
Balancing of Existing Air Handlers for Peak Performance at
Bldgs A –G, LRC
DDC Electronics
for Control and Valves for HVAC Systems, Integrated Energy
Management System (EMS) for Air Handlers in Bldg A - G, LRC
Installation
of Vending Machine Sensors to Save Power
Replace Gymnasium
Lighting with High Efficiency Units
Install Skylights
at the Bldg A & G Corridor to Save Lighting Costs
In Progress
Increase Chiller
and Cooling Tower Capacity – In Progress
Upgrade Central Plant with Common Emergency Generator – In
Progress
Install Power Saving Primary/Secondary Pumping Strategy at the Central
Plant
3D/I
Facilities Programmed Repairs/Renovations Completed in 2003 - 2004
Building K,
Bookstore – Moved to temporary location in Bldg D, until permanent
new location in new Student Center is completed in 2007. Old location
now demolished to make way for the Science Tech Mall
Building O,
Ornamental Horticulture – Project Completed; renovations included
new roof, new HVAC system, and new mech/elec systems for the Greenhouse.
Building P, Automotive Technology – Project Completed; scope
included a complete renovation and upgrades to all the existing spaces and build-out of new space at the front.
Building W, Maintenance – Small amount of covered storage
added to the rear.
Replace Chillers, Cooling Towers
and Boilers at Central Plant Serving Bldg's A thru G, LRC, Future Science, Student Center, Communication Arts & Business CIS Buildings.
|