Use pull down menus below to view projects
back to gcccd.net
Districtwide Program Mngt.
Grossmont Projects
Cuyamaca Projects
Contactor Outreach

Citizens' Oversight

Summer 2003 Projects
 

Previously Completed Projects
Summer 2003

The following projects were completed during the summer and fall of 2003:

A, B, D, E and G Buildings
A-E and G Buildings - Classroom upgrades: paint walls, ceilings and doors. A,
H and P Buildings to receive bathroom upgrades.
A-G Buildings - Lighting occupancy sensors
Building R / Gymnasium - Replace lighting
Building O - Re-roof and upgrade HVAC
A, B, D, E and G Buildings DDC - HVAC controls upgrade

Completed in 2003 - 2004

Reroof Buildings O & P
Upgrade electrical panel & transformer, Building P
Replace All Existing Building Water Valves
Replace Heat Pumps, Buildings O & P
A/C for classrooms, Buildings O & P
Repair and Sealcoat Asphalt Walkways
Waterproofing Repairs to Rear Walls Bldg A - G
Replace A/C Condensate Pans at LRC

Energy Reduction Projects

Completed in 2003 - 2004
Motion Sensors for Classroom Bldgs A,B,D,E, G to Reduce
Electrical Usage in Unoccupied Spaces

Precision Air Balancing of Existing Air Handlers for Peak Performance at
Bldgs A –G, LRC

DDC Electronics for Control and Valves for HVAC Systems, Integrated Energy Management System (EMS) for Air Handlers in Bldg A - G, LRC

Installation of Vending Machine Sensors to Save Power

Replace Gymnasium Lighting with High Efficiency Units

Install Skylights at the Bldg A & G Corridor to Save Lighting Costs

In Progress

Increase Chiller and Cooling Tower Capacity – In Progress
Upgrade Central Plant with Common Emergency Generator – In Progress
Install Power Saving Primary/Secondary Pumping Strategy at the Central Plant

3D/I Facilities Programmed Repairs/Renovations Completed in 2003 - 2004

Building K, Bookstore – Moved to temporary location in Bldg D, until permanent new location in new Student Center is completed in 2007. Old location now demolished to make way for the Science Tech Mall

Building O, Ornamental Horticulture – Project Completed; renovations included new roof, new HVAC system, and new mech/elec systems for the Greenhouse.

Building P, Automotive Technology – Project Completed; scope included a complete renovation and upgrades to all the existing spaces and build-out of new space at the front.

Building W, Maintenance – Small amount of covered storage
added to the rear.

Replace Chillers, Cooling Towers and Boilers at Central Plant Serving Bldg's A thru G, LRC, Future Science, Student Center, Communication Arts & Business CIS Buildings.

Campus Overview:

 
Contact Us | Disclaimer